Week Three

Things are slowing down a bit while the taping and bedding dries.  The door has been installed and some outside siding installed.  I decided to go with LED flushmount lights for brightness.  With two fixtures I might also be working on my tan at the same time.

IMG_1886 IMG_1882 IMG_1885

Leave a Reply

Your email address will not be published.

This site uses Akismet to reduce spam. Learn how your comment data is processed.